Almost There
If I didn't go to the Pinks show on Saturday, I would probably have the car running now. But Pinks was worth it. Here is a list of things I have to do before starting the car up.
Finish the vacuum lines
Fab up a smaller battery
Fill the fluids (gas & coolant)
Put in the spark plugs
Program the AEM
Boost and Fuel tests
Pray and turn the Key
Installed the throttle body. Yeah, I know, don't use paper towels and copper sealant spay.
Throttle body's coolant lines.
Throttle body installed. Notice the fuel line to the rail is kinda short. Had to make another one.
Put some electrical tape around it to make sure it doesn't rub the wires.
Fuel lines: Done
Intercooler Pipes: Done
Boost Controller: Done
Catch Cans: Almost done. Just have to finish the vacuum lines.
Last shot of the day.